Saturday, May 1, 2010

Breaking Ground


The site for the fiber building is changing almost every day......


On Monday they dug a hole for the Sugar house slab, filled it with gravel, and graded it to the right height. There will need to be a rock retaining wall on one side. I hope it can look like the one by the house in Danville where I grew up (only it will be much smaller). There is a stack of wood waiting to be split...poplar and ash. The poplar will be sap wood for the new sugar house for next year's maple syrup production. The ask will be fire wood for the fiber building. We have been shopping for a used Jotul wood stove in Uncle Henry's on line.

On Tuesday it rained. On Wednesday and Thursday they dug trenches for the frost walls and the concrete person came and dropped of boards for the footings. The water supply that fed the old sugar house is capped off. And last evening we spiritually prepared the space for the good things to come, thanking everyone who has taken part in the planning, dreaming and visioning this new place for family and community to make beautiful fiber creations~gathering, as the pieces of a puzzle all falling into place, reaching out to those who share our dream, and receiving the wisdom, inspiration, rosources and joy.

Sunday, April 25, 2010

Norway Farmers' Market


On most Thursdays from May 13th through September 30th you will find us at the Norway Farmers' Market from 2 to 6 pm. The market has about a dozen farmers who bring their items to sell, and it is not just vegetables. You will find:
  • berries, apples, jams and jellies. meats
  • "rustic wood stuff" benches, bird houses, clipboards and cutting boards.
  • perennial flowers, seedlings, and herbs.
  • cinnamon rolls, breads, pies, and cookies.
  • hand knit hats, pocket bags with needlefelted pockets,
  • hand sewn knitting bags, needle felting kits and tools, and yarn....lots of yarn!

Friday, April 23, 2010

And the roof came tumbling down



Two weeks ago after we finished putting away the sugaring equipment we started emptying out the sugar house. The plan is to tear down the old sugar shack conserving as many materials as possible, and to build a fiber processing building on the same spot. The fiber building will be larger, and will provide space for washing, dyeing, and carding wool as well as space for workshops and a farm store. A new sugar house will be built behind the fiber building and back toward the cow lane.

Our daughter Kim was visiting with her 4 children...and friend Keith. We carried the sugaring equipment to the first bay in the barn beginning with the buckets, and ending with the evaporator.

We made piles. A pile of all kinds of metal stuff, piles of boards, piles of things to give away, and a pile for the dump. Dan came by and picked out the steel, which he can use in his blacksmith shop or to build things. Steve picked a few things they could use out of the dump pile, and Lee took some metal and copper pipe.

First the side supports and back shed came off. We wondered if the building would still stand, as these were put on to stabilize it's leaning to the side years ago. It seemed stable enough.
Then Kim, Kieth, and James tackled the roof removing the metal panels one by one and stacking them back by the fence. The chimney from the arch came down, too rusty to keep. Strapping came off and 2x4's and old boards. Kalyn and James helped Mary Ann and I to remove nails from the better boards stacking them back by the fence. We filled a 3 pound coffee can with nails over the 3 days that we worked.


Mary Ann cut down the 2 mostly dead trees to the east, and cut a hole in the west wall to protect the water hydrant from damage when the building fell. We cut holes near the top left corner through which we put a big chain, which was fastened to straps with hooks on the end, and attached to the frame of the truck. We made sure all the children and animals were safe while Marty slowly drove the truck forward in low gear and boom....the building came down with a crash. The roof was sitting on the ground still intact. It would have been easier to dismantle the roof here had we known it would hold up.


Jim came over for half a day and cut down the poplar trees where the tree house used to be. The trees would would have shaded the solar panels that will generate hot water for washing wool and a radiant floor. Jim made the trees fall right where we wanted them and efficiently cut them into manageable pieces. Mark came and spent a day with Mary Ann splitting them by hand with a maul. We have a pile of 3-4 cords of wood to use as firewood and sap wood.

Gary was driving by and stopped in to offer his time and equipment for crushing the roof and hauling it away. The offer was attractive, and later in the week in about 3 hours the whole thing was gone.



Now we are moving the iris, clematis, strawberries to new homes. We have moved "stuff" like the crooked fence, the cap for the truck, and the forecart out of the way in preparation for the "digger" to stake the footprint and dig for the foundation beginning next week.

We plan to keep you posted...stay tuned.